The buildings Paramount has worked on, and what was done to each

A church on St Charles Avenue, a rice mill, a hotel in Gretna and the Convention Center. Paramount lists these four by name with the scope of each job. Brick, stucco, glazing and roofs fail where water finds a gap, so every scope below is some version of closing that gap.

The photos show the buildings. The scope lines are the work Paramount lists for them.

The record

Four buildings, scope as listed

Masonry facade of St Charles Avenue Baptist Church with restored windows
The church facade, St Charles Avenue

Project 01 / Division 04 and 07

St Charles Avenue Baptist Church

7100 St Charles Avenue, New Orleans

Scope Paramount lists

Exterior repair and restoration: masonry cleaning, cast stone repointing, waterproofing, rusted metal lintels over the doors replaced, deteriorated windows reglazed, roof tiles secured and replaced, gutters repaired. Paramount has been invited back for further work at the site.

Brick and stucco facade of The National Rice Mill
Brick and stucco, Montegut Street

Project 02 / Division 04 and 07

The National Rice Mill

522 Montegut Street, New Orleans

Masonry and stucco façade remediation, tuckpointing, masonry repair, window glazing and caulking, and water repellent application.

Round tower of the Holiday Inn on Whitney Avenue in Gretna
Stucco tower, Westbank Expressway

Project 03 / Division 07

Holiday Inn, Westbank Expressway

275 Whitney Ave., Gretna

Stucco façade remediation, window glazing and caulking, and a waterproof coating over the entire exterior, completed without interrupting the business.

Exterior of the New Orleans Convention Center
The Convention Center exterior, Convention Boulevard

Project 04 / Division 07

New Orleans Convention Center

900 Convention Boulevard, New Orleans

Fluid applied waterproofing system installation. The scope on record is one line, and it is a membrane job: a coating applied as a liquid and left to cure into one continuous layer.

Materials in the frame

Brick, glazing and decks up close

Washed brick, restored bay windows and two kinds of coated deck.

Crew in yellow rain gear washing red brick from a swing stage
Red brick being washed from a swing stage
Restored bay windows with plaster medallions on a historic facade
Restored bay windows and plaster medallions
Grey coated deck with a white rail
Grey coated deck, white rail
Decorative aggregate courtyard deck with loungers
Decorative aggregate courtyard deck

Historic and occupied buildings

Work that stays out of the way of the people inside

The Holiday Inn stayed open through its facade work, and the church has invited Paramount back for further work at the site. At the Cotton Mill and Property One condominiums, a Google reviewer writes that Paramount handled years of tuck-pointing and roof work, with the PRC/HDLC approvals the historic buildings needed.

See what each trade covers on the services page, or check the places Paramount works in.